Eaton 60 kVA Betriebsanweisung Seite 70

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 145
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 69
Standard System Installation
Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 9 www.eaton.com/powerquality 64
Rack Setup for the UPS
CAUTION
The UPS is heavy (see page 136). Removing the UPS from its carton requires a minimum of two
people. Use the corrugated lifting sling (packaged with the UPS) to move the UPS.
To install the UPS rail kit:
1. Select the proper holes in the rack for positioning the UPS in the rack (see Figure 46).
Figure 46. Front Rail Screw Positions for the UPS
NOTE Mounting rails are required for each individual cabinet.
NOTE 1 The UPS rails take up position 1 through position 12. The UPS will take up 6U or 18
total hole positions.
NOTE 2 Verify that the hole patterns on the rails and mounting brackets align with the hole
pattern on the rack.
Position 1
Position 9
Mounting
Bracket
Top of RailPosition 12
Position 4
Bottom
of Rack
or Top of Other
Cabinet
Bottom of Rail
Seitenansicht 69
1 2 ... 65 66 67 68 69 70 71 72 73 74 75 ... 144 145

Kommentare zu diesen Handbüchern

Keine Kommentare