Eaton 60 kVA Betriebsanweisung Seite 73

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 145
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 72
Standard System Installation
Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 9 www.eaton.com/powerquality 67
Figure 50. Removing the Electronics Module
11. If the mounting brackets are not already installed, align the two mounting brackets with the screw holes
on the sides of the UPS and secure with the supplied 6-32 flat-head screws (see Figure 51).
Figure 51. Installing the UPS Mounting Brackets
12. Slide the UPS into the rack.
13. Parallel or parallel-ready system only. If you are installing other X-Slot cards besides the Powerware Hot
Sync CAN Bridge Card
, skip to Step 16.
NOTE Leaving the UPS unattached allows you to adjust the UPS position in the rack for any
clearance needed to install the X-Slot cards.
Electronics
Module
Locking Screw
Ring Handle
6-32 Flat-Head
Screws
Mounting Bracket
Seitenansicht 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 144 145

Kommentare zu diesen Handbüchern

Keine Kommentare